Metric Based Design of Integrated Engineering Plants for Robust Performance During Hostile Disruptions

Metric Based Design of Integrated Engineering Plants for Robust Performance During Hostile Disruptions

149 pages· 2007· ISBN 9780549506577
About
In military applications, it is important for a platform (warship, aircraft, etc.) or an installation (airbase, etc.) to maintain war fighting ability after being damaged. In particular, if the unit requires electric power, cooling, or other resources to perform its mission, then these resources must be available following a weapon detonation event. The integrated engineering plant is responsible for providing these services to the mission critical loads in a unit. This work begins with the description of a notional integrated engineering plant for an all-electric warship. This plant includes ac electric power networks, a zonal dc electric power distribution network, a seawater cooling network, and freshwater cooling loops. A layered modeling approach is used to capture the complex dynamic interdependence of these tightly coupled systems. With this approach, it is possible to examine the propagation of faults and cascading failures throughout the dynamically interdependent systems. Novel continuity of service metrics for integrated engineering plants are set forth. These metrics provide a means of predicting the average and worst case level of service the plant can provide, as well as the worst case scenario. This provides a method of making meaningful comparisons between different designs. The computation and meaning of the proposed metrics are explored using the notional plant. To understand how architectural decisions impact continuity of service early in the design process, it is necessary to solve certain robust design problems. Many robust design problems can be described using minimax optimization problems. A new method of solving minimax optimization problems is proposed. The performance of this algorithm is shown to compare favorably with the existing methods on test problems. Finally, the proposed minimax optimization algorithm is applied to the design of the notional integrated engineering plant. Architecture metrics which allow quantitative comparisons of entire classes of designs are set forth. The spatial layout of the plant is optimized to improve the worst case performance of the plant. Additionally, the valve settings of the seawater cooling system are optimized to achieve optimal worst case performance. It is further demonstrated that the design of the spatial layout and the valve settings can be performed simultaneously. Future research in the area is proposed.

Discuss Metric Based Design of Integrated Engineering Plants for Robust Performance During Hostile Disruptions with other readers

Join or start a book club for Metric Based Design of Integrated Engineering Plants for Robust Performance During Hostile Disruptions on Readfeed. Live chat, shared reading progress, and AI discussion questions — free to get started.

Frequently asked questions

How do I join a book club for Metric Based Design of Integrated Engineering Plants for Robust Performance During Hostile Disruptions?

Sign up free on Readfeed, then browse public clubs or start your own club with Metric Based Design of Integrated Engineering Plants for Robust Performance During Hostile Disruptions as the current read. Invite friends with a share link and discuss together with live chat and AI discussion questions.

Can I discuss Metric Based Design of Integrated Engineering Plants for Robust Performance During Hostile Disruptions with other readers online?

Yes. Readfeed book clubs let you chat live, share progress, and join discussions about Metric Based Design of Integrated Engineering Plants for Robust Performance During Hostile Disruptions with readers worldwide — whether your club is virtual, in-person, or hybrid.

Is Readfeed free?

Yes. Creating an account and joining book clubs is free. Sign up to find readers who love the same books and start discussing today.