United States. War Production Board
Wartime production achievements and the reconversion outlook
1,600 labor-management committees in the war production drive
A brief presentation of the controlled materials plan
A handbook on wage incentive plans
Acceptance schedules, airframe production program (Nov. 1, 1942, through Dec. 31, 1944
Accuracy of material supply estimates
Alloy steel survey
Alphabetical listing of major war supply contracts, cumulative through February 1943
American industry in war and transition, 1940-1950
Analysis of copper savings through substitution of silver
Analysis of maintenance, repairs and operating supplies requirements of the pulp, paper, printing and publishing industries
Analysis of use of WPB forms