Vincent A. Mabert
Integrated production systems
Integrated Production Systems Design, Planning, Control, and Scheduling
Production planning, scheduling, and inventory control
An introduction to short term forecasting using the Box-Jenkins methodology
Cases in manufacturing and service systems management
Cases in operations management
Evaluating scheduling decision rules using a fractional factorial design
Forecast modification based upon residual analysis
Heuristic work force scheduling with variable shift lengths and labor productivity differences
Managing productivity in the United States Postal Service
Production planning, scheduling, and inventory control
Sampling as a solution methodology