Readfeed

Ontario. Environmental Hearing Board.

  • Final report, covering the period January 1, 1975 to April 19, 1976Final report, covering the period January 1, 1975 to April 19, 1976
  • Public hearing on lead contamination in the Metropolitan Toronto areaPublic hearing on lead contamination in the Metropolitan Toronto area
  • Public hearing on Ontario Hydro Bradley-Georgetown 500 kv. transmission line right-of-way between point 33 near Colbeck and point 95 near LimehousePublic hearing on Ontario Hydro Bradley-Georgetown 500 kv. transmission line right-of-way between point 33 near Colbeck and point 95 near Limehouse
  • Report of the Environmental Hearing Board concerning the Bradley-Georgetown 500kV transmission line route between point 33 near Colbeck and point 95 near Limehouse, December 1975Report of the Environmental Hearing Board concerning the Bradley-Georgetown 500kV transmission line route between point 33 near Colbeck and point 95 near Limehouse, December 1975
  • Report on the public hearing on lead contamination in the metropolitan Toronto areaReport on the public hearing on lead contamination in the metropolitan Toronto area